The master bedroom was the original detached kitchen. It was remodeled many years ago, and was attached to the house by a cedar closet. This space will be completely remodeled, exposing the fireplace, and reworking the bathroom, with an addition of his and hers closets. The small porch off this bedroom will be enlarged to include a twin bed swing to be constructed by Jordan.
Abatement
September 6, 2014
Back wall has been removed exposing the fireplace, and the ceiling has been vaulted. The closet has been stripped, and converted into two parts: a hallway connecting the Master Bedroom into the Great Hall, and a cozy study for Mike and I. A window will be added to the study for inspiration and breathing room.
September 7, 2014
The fuse box will be moved to the basement. Wouldn’t you hate to rewire that mass of wires?
November 16, 2014
December 5
This room will be toasty warm with the blown in insulation and fireplace. The sheetrock defines the wall behind the fireplace that separates the bedroom from the bathroom.
December 25
From studs to beams, things happen quickly. The horizontal wood came from the house.
We now have closet doors and paint on the ceiling. The drop cord goes to the speakers
Since this was once the kitchen, the floor was plain. We placed pine throughout for uniformity.
February 12
The cove mold is going up quickly. This is a primer coat of paint
February 22
This week, the bathroom is getting it’s tile makeover.
March 8
The mantle was re purposed from the front porch, where it was an original support beam.
The study has been painted.
April 22
Corey, the Tile Man, is a friend of our Tile Man in Fayetteville, James. Both do an excellent job.
The counter-tops are in as well. Mike has done a great job with this
The fireplace has also been pointed up.
The study now has a counter top and cabinets. The old fuse box is no more.
May 1
Corey’s team has put in many hours putting the counter top and tile together.